Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd

Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd

Manufacturer from China
Site Member
7 Years
Home / Products / Packing Production Line /

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

Contact Now
Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd
Province/State:shandong
Country/Region:china
Contact Person:MrZhou Marvin
Contact Now

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

Ask Latest Price
Video Channel
Brand Name :Gongda
Model Number :GD-ZMJ-1000
Certification :CE, UL,ISO
Place of Origin :China
MOQ :Negotiable
Price :Negotiable
Payment Terms :TT
Supply Ability :20 sets per month
Delivery Time :40-50 working days
Packaging Details :iron frame /plate
Voltage :220V or 380V or Customized
material :SUS304
Type :Germinating and kilning box
Condition :New
Application :Produce malt
grain :barley ,corn ,wheat
capacity :100 kg-5tons
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

1
Germinating and kilning box

1.

Capacity: 1T/Batch; Including Sieve Plate
2.Length*width*height:

will be designed according to your plant area;
3.Chest Wall Thickness: 2mm
4.

Malt Turner Boosting Speed:
0.4-0.5m/Min;
5
Malt Turner Rotating Speed:8-9R/Min


set
1  SS304

NOTE:

1. The above price is based on EXW Qihe basis.

2. Payment Term: T/T (50% payment in advance, 50% before shipment)

3. The offer is valid in 30days.

4. This price doesn’t include the installation and testing costs in field fabrication.

5. If buyer asks seller to provide staffs to install and adjust equipments, buyer is responsible for these staffs’ tickets, visa, wages, accommodation.

Operation
1) Turn on master switch for power supply.

2) Turn on water valve to add water into all water tanks. Be sure to reach water level specified. Turn on compressed air valve.

3) Press temperature control buttons to preheat water in tanks.

4) Set sterilizing temperature and temperature alarm (upper limit temperature and lower limit temperature) in Temperature controller. In general, you just need to set sterilizing temperature.

5) Turn on steam valve manually to preheat water in water tank at cooling section. Water temperature is displayed on thermometer.

6) When water temperature reaches the set point (PV display area), start bottle input /output conveyors to transfer full bottles into this machine.

7) When you finish sterilizing operation, you shall turn off steam valves and water supply valves at first, then stop all spray pumps, at last, stop mesh belt conveyor and bottle input /output conveyors.
.

Inquiry Cart 0