
Add to Cart
No | name | components | specification |
1 | Grain Milling Unit | Rolling Miller | Double roller Speed differential |
2 | Brewhouse unit | Mash/Lauter tun | Grain rake with VFD Laser cutting V-wire False Bottom Easy clean and detachable sparging spray ring Multihole wort collect ring(optional) Anti-rinser(optional) |
Kettle/Whirlpool Tun | Steam Jacket on bottom and side/direct gas fired heating/electric heating Steam vent with condensate ring for kettle stack |
||
Hot water tank | Steam Jacket heating/direct gas fired heating/electric heating | ||
Heat exchanger | SUS304 plate | ||
3 | Fermentation unit | Fermenter | Glycol cooling jacket on cone and bottom Side or top manway CIP arm and CO2 blow off arm Germany import Kieselmann Mechanical relief valve Shockproof pressure gauge Rotating racking arm Dry hopping port Carbonation stone Sight level |
4 | Bright beer tank | Bright beer tank | Glycol cooling jacket on cone and bottom Side or top manway CIP arm and CO2 blow off arm Germany import Kieselmann Mechanical relief valve Shockproof pressure gauge Rotating racking arm Dry hopping port Carbonation stone Sight level |
5 | Glycol Chilling Unit | Glycol Water Tank | Insulated conical top and sloped bottom |
Cold Water Tank | Dimple plate on side wall | ||
Chiller | |||
6 | Control unit | Brewing and fermetation process Controlling | Manual button control panel or PLC control with touch screen for special |
7 | CIP unit | Caustic Tank | electric heating element inside |
Sterilization Tank | |||
Transfer&Control | |||
8 | Others |
Mash/Lauter tank
1. Material: SUS304
2. Total volume:300L, effective volume:200L;Conical head
3. Thickness of insulating layer:80mm;
4. Inner Body Thickness: 3mm.
5. With cleaning ring, top CIP spray 2 balls
6. TOP mechanical agitation: cycloidal reducer;
7. Milled plate false bottom :4mm
8. The manhole with sight glass
9. Thermowell tube with PT 100 temperature probe;
10. Ribbon polished for the welded place;
11. With Liquid meter
12. Condensate water pipe
13. Three legs with brace and adjustable bolt;
14. Necessary fittings and valves.
Decorative tube
LED Sight light
Digital display gauge
Kettle/ Whirlpool tank
1. Material: SUS304
2. Effective volume:200L;Conical head
3. Electrical coil heating,power 10 kw
4. Condensate water pipe
5. Thickness of insulating layer: 80mm;Rock wool
6. Inner Body Thickness: 3mm.
7. Top two CIP Spray balls
8. Ribbon Polished on welds
9. The manhole with sight glass;
10. Thermowell tube with PT 100 temperature probe;
11. with Liquid meter
12. Three legs with brace and adjustable bolt;
13. With tangent line
14. Necessary fittings and valves.
Decorative tube
LED Sight light
Digital display gauge
1. Q: Are you a manufacture?
A: Yes, we’ve been in producing, exporting and installing brewery equipment for 21 years.
2. Q: Have you sold equipment to our country before? Which brewery is it?
A: We have 600+ world-wide customers, covering every continent. With your detailed request of brewery,
we’ll provide you contacts for calling and visiting our successful brewery projects.
3. Q: What kind of equipment should I choose?
A: With knowing your expected beer output & brewery area dimension, we will choose the most appropriate equipment for you.
4. Q: Is customize available?
A: Sure, and that’s the spirit of craft beer brewing: multy-possibilities & being unique.
5. Q: Will I get design or solutions for my brewery?
A: Definitely, we design brewery layout for every client. Further more, beer recipes and brewing tutoring if needed.
6. Q: How should I install the brewery?
A: You will get our full and accurate online guidance, including video, picture instruction, etc. If you need a paid installation service, our experienced technicians will handle the whole process as a turnkey project.
7. Q: Is your system manual or automatic?
A: All the electric devices are controlled by PLC system. It’s semi-auto on brewhouse and full-automatic on fermentation. You can read all status of brewing on the screen/gauges.
8. Q: How should I pay?
A: After signing contract, 30% by T/T in advance and balance before shipment.
9. Q: How long does the production take?
A: Generally 30 working days since receipt of down-payment.
10. Q: What about quality warranty?
A: We provide 5 years warranty for main equipment, and 1 years for electric devices.